Q-2, r. 2 - Regulation respecting the application of section 32 of the Environment Quality Act

Full text
5.2. For the purposes of section 5.1, except if not more than 20 persons are housed in a temporary industrial camp, the operator of the camp must send a notice to the Minister at least 4 weeks before the beginning of the work. The notice must specify
(1)  the geographical coordinates of the camp;
(2)  the maximum number of persons that will be housed at the same time in the camp; and
(3)  the planned dates and period of time during which the camp is to be occupied.
The following must be attached to the notice:
(1)  a certificate from a person who is a member of a competent professional order attesting that the installation of drinking water treatment apparatus or equipment or an increase in their production capacity will meet the requirements provided for in the Regulation respecting the quality of drinking water (chapter Q-2, r. 40);
(2)  a certificate from a person who is a member of a competent professional order attesting that the treatment and disposal of wastewater and, if applicable, process water from a drinking water treatment apparatus or equipment are not likely to constitute a source of contamination within the meaning of section 1 of the Environment Quality Act (chapter Q-2).
If the temporary industrial camp must be used by a larger number of persons or for a longer period of time than the period provided for in the first paragraph, a new notice and a new certificate must be sent to the Minister at least 4 weeks before the change.
O.C. 1033-2011, s. 4.